Sorry, I forget were all not keeping up with the cart : )
The first KH building program was called "Quick Build" and got started in the late 70's early 80's. It took some time to soak in that building a KH in 3 days did not make a very good building, and most of them started having problems quickly! That was replaced by the RBC, Regional Building, in this system, states were cut up into areas, and the projects expanded to 2, 3 day weekends. And much tighter control on the workers, with everyone having to apply, and be approved by the elders, and the RBC. Now enter the LDC, Local Design, it breaks the country into 11? LDC areas, the power is totally removed from local elders over anything but truly minor repair work on there KH. The 11? LDC's decide everything 100%. KH's will be inspected on a regular basis, by an inspection team, that report to the RDC. There are also teams that will go out and teach local cong, the proper up keep, and cleaning process, and products. One floor plan, adjustable in size. NO local choice in anything!